Gold production resumes at Çöpler mine more after deadly landslide in 2024 - Bianet
Gold
AI desk brief
Anagold has resumed processing stockpiled ore at Turkey’s Çöpler gold mine under a temporary operating permit, targeting approximately 1.3 metric tons by year-end. The operator told Bloomberg processing restarted in the third quarter; the mine produced around 6.9 tons annually before suspension following the February 2024 landslide that killed nine workers. The restart restores some supply, but the article does not establish a material bullion-price effect, and negligence proceedings continue. Separately, Turkey’s energy minister set a national annual gold-production target of 100 tons without specifying a timeline.
Sources used
- S1 Bianet via Google News — Gold production resumes at Çöpler mine more after deadly landslide in 2024 - Bianet