Tudor Gold Announces Positive Preliminary Economic Assessment for Treaty Creek’s Goldstorm Deposit: Study Outlines Gold-Copper Underground Mine with Projected 28-Year Mine Life Producing 4,677,902 Ounces of Gold plus Copper and Silver - Resource World Magazine
Gold
Silver
AI desk brief
Tudor Gold’s preliminary assessment of Goldstorm at its 80%-owned Treaty Creek project projects 4.68 million ounces of gold and 22.14 million ounces of silver over 28.25 years, requiring US$1.54 billion in pre-production capital. At assumed prices of US$3,670/oz gold, US$50/oz silver and US$5/lb copper, after-tax NPV at 5% is US$2.3 billion, with a 20% IRR. Inferred resources account for about 29% of planned gold ounces; no reserves are declared and economic viability is unproven. Development would depend on permits, infrastructure agreements and resolving overlapping tenure; no material near-term bullion effect is established.
Sources used
- S1 Resource World Magazine via Google News — Tudor Gold Announces Positive Preliminary Economic Assessment for Treaty Creek’s Goldstorm Deposit: Study Outlines Gold-Copper Underground Mine with Projected 28-Year Mine Life Producing 4,677,902 Ounces of Gold plus Copper and Silver - Resource World Magazine